Nalubaale, Kira Hydropower Plants Temporarily Shut Over Floating Weeds

Date:

- Advertisement -
- Advertisement -
- Advertisement -
- Advertisement -

Uganda | Xinhua | Uganda shut down two key hydropower plants in the eastern part of the country on Tuesday after a floating “island” of weeds moved toward the installations.

Umeme Limited, the country’s main electricity distributor, said in a statement that the floating weeds had appeared at the Nalubaale and Kira dams on the Nile River as it started its journey from Lake Victoria.

“The development is affecting supply in the Kampala Metropolitan and surrounding areas following emergency load shedding until the floating island has been cleared,” Umeme added.

The two plants account for about 380 MW of the East African country’s current generation capacity of more than 1,300 MW.

In 2020, Uganda experienced a nationwide power blackout after floating weeds affected the Nalubaale power plant, one of the leading hydropower stations in Uganda.

Do you have a story in your community or an opinion to share with us: Email us at thestandard256@gmail.com
Or WhatsApp Us on +256750474440

- Advertisement -

Share post:

Popular

More like this
Related

3M Stock Price Jumps 20% to Two-Year High on Strong Earnings

Shares of 3M (MMM) soared Friday after the maker...

Stocks Rally on Strong Earnings, Tech Recovery and Rate-Cut Hopes

U.S. stocks closed sharply higher Friday as the tech...

What is Travel Insurance and What Does it Cover?

Deciding whether to purchase travel insurance can be challenging,...

Why Museveni Reversed Katunguka’s NCHE Re-appointment

President Museveni has reversed his earlier position where he...